October 2016 – Project Update Notifications

Countryside Properties – Loughborough Park Phase 3

Continuing our work with Countryside Properties, Stanmore have recently secured the external façade and internal dry lining packages at the third phase of Loughborough Park in Brixton.

Metsec lightweight steel framing, Trespa cladding and Envirowall render makeup the external façade with a British Gypsum drywall system internally, this final phase of the project involves the demolition of the remaining buildings on site to provide 276 homes across 3 buildings.

Berkeley Homes East Thames – Kidbrooke Phase 5

Working alongside Berkeley Homes East Thames, Stanmore have recently secured the Metsec lightweight steel frame Façade package at Phase 5 of the Kidbrooke Development.

This new phase is called Meridian Gate and is centrally located within Kidbrooke Village, ideally positioned between the new Cator Park and established Sutcliffe Park and offering stylish apartments.

Berkeley Homes Western – Kennett Island Phase 3

Working with Berkeley Homes Western, Stanmore have recently secured the external façade and internal dry lining packages at Kennett Island, Phase 3.

Stanmore are installing a Metsec lightweight steel frame fa çade, Sto insulated external render system and a British Gypsum drywall system internally.

Kennet Island, located a short distance from Reading town centre is an exemplary, modern and well established community offering a range of high specification apartments and houses.

Berkeley Homes Eastern Counties – Brunswick Square, Orpington

Alongside Berkeley Homes Eastern Counties, Stanmore have recently secured the external façade package at Brunswick Square, Orpington. A stunning collection of just 83 contemporary one and two bedroom apartments, each with a private terrace, winter garden or balcony and some offering private parking.

Stanmore are installing a Metsec lightweight steel frame, sheathing board, insulation, brick tie channels and Marley Eternit Equitone cladding.

Allenbuild – Clapham Park Estate

Working alongside Allenbuild, Stanmore have recently been successful in tendering the internal dry lining package on the latest phase of Clapham Park Estate.

A collection of 3 & 4 storey town houses in the heart of the redevelopment of the Clapham Park area.

Lend Lease – Orchard Gardens, Elephant Park, Elephant & Castle

Working with Lend Lease, Stanmore have recently secured the Metsec lightweight steel frame Façade, external cladding and internal dry lining packages at West Grove, Elephant Park.

A vibrant neighbourhood at the heart of the new Elephant & Castle development, West Grove is made up of 593 homes in a range of different sizes, set within two tall buildings and a series of mansion blocks that vary in scale from five to 31 storeys.